Schedule Online

Bathroom Remodeling & Home Improvement Contractor in Bradenton and Along the Suncoast

Commercial Bathroom Remodeling

A restroom gets more use in a week at a business than a home bathroom sees in months. Planning the upgrade means choosing finishes that hold up, keeping your doors open, and sorting out code questions before work starts.

Modern bathroom with vessel sink, walk-in shower and herringbone tile

Key takeaways

  • Commercial restrooms need tougher, easier-to-clean materials than most homes, such as porcelain tile, epoxy grout and solid-surface or phenolic partitions.
  • Phasing the work by restroom, by floor or by after-hours shift can keep a business running while one area is under construction.
  • ADA requirements apply to many commercial restrooms, and the owner or designer is responsible for confirming compliance and permits before work begins.
  • Cost depends mostly on the number of fixtures, whether plumbing moves in the slab, partition type, and how much work has to happen outside normal hours.

A dated restroom says something about a business before a customer ever reaches the counter. Cracked tile, stained grout, a wobbly partition or a fan that doesn't work tell visitors that maintenance isn't a priority. Commercial bathroom remodeling fixes that by replacing worn surfaces and fixtures with materials chosen for heavy use and easy cleaning. Today's Home Services serves both homeowners and commercial property owners, and we handle commercial as well as residential bathroom remodeling across the Bradenton and Sarasota area.

Properties we can help with

Commercial restrooms come in many forms, and each has its own priorities. We can plan remodels for properties such as:

  • Offices and professional suites, where staff and clients share one or two restrooms and appearance matters
  • Retail stores, where a customer restroom has to stay presentable through a full day of traffic
  • Restaurants and cafés, where restrooms face strict cleaning routines and inspections
  • Rental and vacation properties, where bathrooms take hard use between turnovers
  • Condo association common areas, such as clubhouse, pool and fitness-room restrooms
  • Churches and community buildings, where use comes in waves around services and events

The right materials and schedule depend on who uses the space, how often and when.

What a restroom upgrade can include

Not every project is a full gut. Some owners need a refresh, while others need everything replaced down to the slab. Common parts of a commercial restroom remodel include:

Partitions and stalls

Toilet partitions take abuse from doors, kicks and cleaning chemicals. Replacing worn or rusting stalls with more durable materials, such as solid plastic or phenolic panels, can change the feel of a restroom quickly. Panel material, mounting style and hardware all affect durability and price.

Fixtures

New toilets, urinals, sinks and faucets can cut water use and maintenance calls. Wall-hung toilets and sinks make floor cleaning easier, though they need in-wall carriers and solid framing. Sensor faucets and flush valves are another option for high-traffic restrooms. For single-fixture swaps, see our toilet replacement and sink and faucet pages.

Tile, walls and flooring

Floors and lower walls get mopped, splashed and scuffed daily. Porcelain tile is a common choice for its low absorption and wear resistance, and a tiled wainscot protects drywall around sinks and toilets. Our bathroom tile and bathroom flooring pages explain the options in more depth.

Lighting and ventilation

Bright, even lighting makes a restroom feel cleaner, and a properly sized exhaust fan controls odors and humidity, which matters in Florida's climate. Fans that run on occupancy or humidity sensors keep air moving without relying on staff. See bathroom lighting and ventilation for details.

Accessibility considerations

ADA requirements apply to many commercial restrooms, covering things like clear floor space, grab bar locations, sink and mirror heights, door widths and toilet placement. The property owner or designer is responsible for confirming compliance and permits for the specific building and scope. We build to the approved plans and can install the blocking, grab bars and fixtures those plans call for. For background on accessible design, see our accessible bathrooms page.

Working around your business hours

Closing a restroom affects customers, staff and sometimes your health or occupancy approvals. Phasing the work helps keep things running. Depending on the property, that can mean:

  • Remodeling one restroom at a time when there's more than one
  • Scheduling demolition and other loud, dusty steps before opening or after closing, where building rules allow
  • Setting up dust barriers and protected walkways so the rest of the space stays usable
  • Coordinating with property managers or condo associations on approved work hours, elevator use and insurance certificates

We'll talk through what's realistic for your space before the schedule is set. A small restroom refresh can often move quickly, while a full remodel with plumbing changes typically takes longer, depending on inspections, material lead times and any hidden conditions found during demolition.

Choosing materials that hold up

Commercial restrooms reward durability over trend. A few choices make a real difference:

  • Porcelain tile for floors and walls, with a slip-resistant finish on the floor
  • Epoxy or high-performance grout, which resists stains and doesn't need sealing
  • Cove base or tile base where the floor meets the wall, so mops don't soak drywall
  • Solid, well-anchored partitions and accessories, mounted into blocking rather than just drywall
  • Commercial-grade faucets and flush valves with replacement parts that are easy to find
  • Corrosion-resistant finishes for properties near the water, where salt air attacks exposed metal

Lighter, simpler finishes also make it easier to see when something needs cleaning or repair.

Our process

  1. Site visit and conversation. We look at the existing restroom, plumbing locations, walls and floors, and talk about your hours, traffic and goals.
  2. Scope and estimate. You receive a written scope that lists what's included, with materials and phasing spelled out.
  3. Plans, approvals and permits. You or your designer confirm code and accessibility requirements, and any association or landlord approvals are lined up before work starts.
  4. Scheduling and protection. We set a schedule around your operations and protect adjacent areas from dust and debris.
  5. Demolition and rough-in. Old finishes come out, and plumbing, electrical and blocking are updated as the plans require.
  6. Waterproofing, tile and finishes. Floors and walls are prepared, tiled and grouted, then partitions, fixtures and accessories are installed.
  7. Inspection, walkthrough and cleanup. Required inspections are completed, we walk the space with you to address any final items, and we clean up when we're done.

What affects the cost

Every commercial restroom is different, so we price each project after seeing it. The main cost drivers include:

  • The number of restrooms and fixtures involved
  • Whether drains or supply lines move, especially if the concrete slab must be cut and trenched
  • Partition material and mounting style
  • Tile size, type and the amount of wall area being tiled
  • Accessibility changes required by the approved plans
  • After-hours or phased scheduling, and site protection needs
  • Condition of the subfloor and walls once demolition begins
  • Permit and approval requirements for the building

For a broader look at how bathroom pricing works, read how much a bathroom remodel costs. You can also explore our full range of bathroom remodeling services.

If your restroom is overdue for an upgrade, reach out to schedule a free estimate and we'll walk the space with you.

Related Bathroom Services

What Clients Say

  • “Great workers! Great job- They focus on detail, they are clean/they clean up after every day! Thank you for such Great Remodel of our master bath!”

    — Virginia Carmichael

  • “My house was replumbed last year due to cast iron pipes. Today's Home Service did an awesome job remodeling both bathrooms. I have more updates and maintenance in mind for my home. It gives me peace of mind to have found a company I can trust to help me with everything.”

    — Helen Downs

Read more client reviews

Commercial Bathrooms FAQs

Can you remodel our restroom without closing the business?
Often, yes, with planning. If you have more than one restroom, we can usually complete one at a time so another stays open. Where there's only one, the noisiest steps, such as demolition and tile cutting, can sometimes be scheduled around your busiest hours, and temporary arrangements can cover the gap. We'll talk through your hours, traffic and options during the estimate.
Will the remodeled restroom be ADA compliant?
ADA requirements apply to many commercial restrooms, but compliance depends on the building, its use and the scope of work. The property owner or their designer is responsible for confirming which standards apply and for securing permits. We'll build to the approved plans and specifications, and we encourage you to involve an architect or accessibility consultant when the requirements aren't clear.
Do you handle bathrooms in rental and vacation properties?
Yes. Rental and vacation units sit between residential and commercial work. They're usually built to residential code but used much harder, with frequent turnovers and guests who don't treat fixtures gently. That makes durable tile, simple fixtures with easy-to-find replacement parts, and good ventilation especially worthwhile. We can also plan the schedule around bookings or tenant move-outs.
What do you need from us to give a commercial estimate?
It helps to know the property type, how many restrooms and fixtures are involved, your operating hours, and any plans or drawings you already have. For condo association or landlord-controlled spaces, let us know about approval requirements, insurance certificates and allowed work hours. A site visit lets us see the existing plumbing, walls and floors before we put the scope in writing.
Today's Home Services van

Get the Results You Deserve Today

From a single vanity swap to a complete bathroom remodel, our family-owned team has served homeowners and property owners along the Suncoast since 2016. Call us or send a request online to schedule a free consultation.

Call
Call NowFree Estimate